Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Dec 18, 2023     Secured pitot and AOA connections in wing - (2 hours)       Category: Wings
Took a break from wiring to address the issues with securing the pitot and AOA connections. Match drilled the bracket I made earlier to the wing rib with the pneumatic drill. Deburred the holes, clecoed the bracket and was barely and I mean barely able to get a rivet puller in through the access panel to be able to get to the rivet and actually pull it enough to get the mandrel to break off. I was then able to tighten down the Adel clamps to hold the connections in place. Connected the pitot and AOA tubes and called it a day. Glad to be done with this. Now to secure the wiring.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.